In the morning, I saw the footings had been poured on Monday, 4/30/2001.
The foam block was stacked in the street.
More of the footings and rebar.
When I got home, the contractor, Jerry, was there with the cement truck filling the frost walls/foundation.
Here you can see the frostwall as it becomes the "wall wall". The two depressions are where the "man doors" will be.
Closeup of the man-door area
Another shot of the trench where I'll run water, electricity, and "other" stuff - like ethernet, phone, cable-TV, and whatever else strikes my fancy.