Login
Gallery 1974 Travelette IH 5spd Building the 74/75 transmission mount Shifter was notched in one place with a grinder until I cut enough and got it hot enough to finish bending, then re-welded. This
Advanced Search
RSS Feed for this Photo View Slideshow View Slideshow (Fullscreen)

Building the 74/75 transmission mount

1. After... ... 74. DCP_0006.JPG 75. DCP_0007.JPG 76. "Raised"... 77. Shifter was... 78. Reverse 79. 2nd gear 80. 5th gear ... 94. 2012-09-26_...

Shifter was notched in one place with a grinder until I cut enough and got it hot enough to finish bending, then re-welded. This

Shifter was notched in one place with a grinder until I cut enough and got it hot enough to finish bending, then re-welded. This is in 1st gear

Date: 12/31/1969
Size:
Full size: 1152x864
nextlast
first previous
Shifter was notched in one place with a grinder until I cut enough and got it hot enough to finish bending, then re-welded. This

Photo Properties

summary  details
Make EASTMAN KODAK COMPANY Model KODAK DC3200 DIGITAL CAMERA
Aperture Value f/3.6 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash Metering Mode Multi-Segment
Shutter Speed Value 1/16 sec
nextlast
first previous
Powered by Gallery v2.3