Login
Gallery Little Devil 2005 Rear Shock Hoop and continued repairs - July/Aug
Advanced Search
RSS Feed for this Album View Slideshow View Slideshow (Fullscreen)

2005

1. Cage... ... 3. Paint Schemes 4. Painting... 5. Final... 6. Repairing... 7. Rear Shock ... 8. 8/6 -... 9. Acton...

Rear Shock Hoop and continued repairs - July/Aug

Date: 07/29/2005
Size: 39 items
nextlast
Checking droop

Checking droop

Checking droop

Date: 12/31/1969
Views: 1489
Roughly where I thought the shocks would come up

Roughly where I thought the shocks would come up

Roughly where I thought the shocks would come up

Date: 12/31/1969
Views: 1046
Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Date: 12/31/1969
Views: 1186
dcp 0014

dcp 0014

dcp 0014

Date: 12/31/1969
Views: 994
Holding the new U-bolt plate based lower mount in place for testing

Holding the new U-bolt plate based lower mount in place for testing

Holding the new U-bolt plate based lower mount in place for testing

Date: 12/31/1969
Views: 1181
See the lower mount?

See the lower mount?

See the lower mount?

Date: 12/31/1969
Views: 986
To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

Date: 12/31/1969
Views: 1633
To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

Date: 12/31/1969
Views: 1220
First mock up of the uprights

First mock up of the uprights

First mock up of the uprights

Date: 12/31/1969
Views: 1031
Checking "bump" clearance

Checking "bump" clearance

Checking "bump" clearance

Date: 12/31/1969
Views: 1140
For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

Date: 12/31/1969
Views: 1252
The uprights

The uprights

The uprights

Date: 12/31/1969
Views: 1161
dcp 0023

dcp 0023

dcp 0023

Date: 12/31/1969
Views: 4150
dcp 0024

dcp 0024

dcp 0024

Date: 12/31/1969
Views: 1570
dcp 0025

dcp 0025

dcp 0025

Date: 12/31/1969
Views: 1066
Welding

Welding

Welding

Date: 12/31/1969
Views: 1594
dcp 0027

dcp 0027

dcp 0027

Date: 12/31/1969
Views: 981
dcp 0028

dcp 0028

dcp 0028

Date: 12/31/1969
Views: 1160
Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Date: 12/31/1969
Views: 1333
After welding the mounts onto the bolt-in upright hoop.

After welding the mounts onto the bolt-in upright hoop.

After welding the mounts onto the bolt-in upright hoop.

Date: 12/31/1969
Views: 1358
dcp 0002

dcp 0002

dcp 0002

Date: 12/31/1969
Views: 1903
dcp 0003

dcp 0003

dcp 0003

Date: 12/31/1969
Views: 1123
U-bolt plates after welding the lower mounts to them.  They are offset to the outside of the vehicle.

U-bolt plates after welding the lower mounts to them. They are offset to the outside of the vehicle.

U-bolt plates after welding the lower mounts to them. They are offset to the outside of the vehicle.

Date: 12/31/1969
Views: 2914
Paint

Paint

Paint

Date: 12/31/1969
Views: 1227
Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Date: 12/31/1969
Views: 1221
nextlast
Page: 1 2
Advanced Search
Powered by Gallery v2.3